Geometrical Method of Scheduling in Project Management
Authors:I V Burkova  V N Kolpachev  A M Potapenko
Affiliation:(1) Trapeznikov Institute of Control Sciences, Russian Academy of Sciences, Moscow, Russia;(2) Voronezh State University of Architecture and Civil Engineering, Voronezh, Russia
Abstract:Consideration was given to scheduling by the criterion for uniform use of resources. It was assumed that each job is executed by a unit resource. Two types of inter-job dependences were studied: ldquofinish–finishrdquo (one job cannot be completed until the other is completed) and ldquofinish–startrdquo (one job cannot be started until the other is not completed). To solve the problem, a geometrical method reducing solution to determining the shortest trajectory in a domain constructed from the network graph was proposed.