大跨度连续梁桥0号段施工技术
引用本文:隋国嵩. 大跨度连续梁桥0号段施工技术[J]. 山西建筑, 2008, 34(16): 305-306
作者姓名:隋国嵩
作者单位:中铁十三局集团第一工程有限公司,辽宁,大连,116033
摘    要:结合具体工程实例,介绍了大跨度连续梁桥0号段施工的方案比选,详细阐述了具体的施工过程,同时对工程施工中的重难点进行了分析,对同类型的桥梁施工有一定的参考价值。

关 键 词:大跨度  连续梁桥  托架  混凝土
文章编号:1009-6825(2008)16-0305-02
修稿时间:2008-02-19

The construction technology of large span continuous beam bridge No.0 section
SUI Guo-song. The construction technology of large span continuous beam bridge No.0 section[J]. Shanxi Architecture, 2008, 34(16): 305-306
Authors:SUI Guo-song
Affiliation:SUI Guo-song
Abstract:Combining with concrete engineering practice,the scheme selection of large span continuous beam bridge No.0 section construction was introduced,the concrete construction process was explained in detail,and the importance and difficult point in engineering construction were analyzed,which can provide references for future similar beam bridge construction.
Keywords:large span  continuous beam bridge  bracket  concrete  