双压余热发电系统公共过热器设计分析*
引用本文:时小宝,刘怀亮,彭岩.双压余热发电系统公共过热器设计分析*[J].水泥工程,2015,28(1):18-23.
作者姓名:时小宝  刘怀亮  彭岩
作者单位:中信重工机械股份有限公司,中信重工机械股份有限公司,中信重工机械股份有限公司
摘    要:水泥熟料生产线配套建设的余热发电工程是依附于水泥工艺生产状况及余热条件,而随着水泥行业生产工艺的技术进步,其熟料烧成系统能耗不断下降,窑尾预热器出口进SP余热锅炉的烟气温度相应降低,对余热发电系统设计及运行产生重要影响。以典型5000t/d水泥熟料生产线余热参数为例,对比分析了有、无公共过热器的两种余热发电系统,得出结论为:有公共过热器的余热发电系统高压蒸汽产量相对偏低;若公共过热器出口蒸汽温度越高,系统输出功率也越大;余热发电系统设计公共过热器是否合理,取决于窑尾预热器排烟温度及循环水温度两项重要影响因素。

关 键 词:水泥窑  余热发电  公共过热器  余热锅炉  汽轮机

Design analysis of Public superheater in dual-pressure waste heat power generation system
Shi Xiaobao,Liu Huailiang,Peng Yan.Design analysis of Public superheater in dual-pressure waste heat power generation system[J].Cement Engineering,2015,28(1):18-23.
Authors:Shi Xiaobao  Liu Huailiang  Peng Yan
Affiliation:CITIC Heavy Machinery Limited by Share Ltd.,CITIC Heavy Machinery Limited by Share Ltd. and CITIC Heavy Machinery Limited by Share Ltd.
Abstract:The effect of waste heat power generator depends on the production and waste heat condition of the cement clinker production line, and as its technology progress, the heat consumption of clinker burning system is declining and the temperature of waste gas that come out from kiln end preheater and go to SP waste heat boiler reduced accordingly, which has great impact on design and operation of waste heat power generator system. Taking the waste heat parameters of a typical 5 000 t/d cement clinker production line as an example, the waste heat power generator systems with and without public superheater were contrasted, and the conclusion is as follows, the output of high pressure steam of the system with public superheater is a little low, and higher the outlet steam temperature, the more output power of public superheater system; design of public superheater is reasonable or not, depends on two important factors of kiln tail preheater exhaust gas temperature and the temperature of circulating water.
Keywords:cement kiln  waste heat power generating  public superheater  waste heat boiler  steam turbine