Double shield TBM performance analysis in difficult ground conditions: a case study in the Gerede water tunnel,Turkey
Authors:Aydin Shaterpour-Mamaghani  Deniz Tumac  Emre Avunduk
Abstract:The performance analysis of double shield TBMs in difficult ground conditions in the Gerede tunnel is presented in this study. The strength of the encountered formations along the tunnel route varied from medium strength (sandstone, limestone) to high strength (basalt). The total length of tunnels is 31.6 km, which was excavated by three double shield TBMs having diameter of 5.57 m. Literature studies are first carried out in order to review the difficult ground conditions and their impacts on mechanized tunnelling. Later, the project, geology, and the characteristics of the TBMs are given in detail. Then the factors affecting the performance of the TBMs, machine utilization, and operational parameters (torque, thrust) are discussed in detail. In the light of these facts, the main objective of this study is to describe the possible improvement methods to reduce the effect of these difficulties on TBM performance.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号