首页 | 本学科首页   官方微博 | 高级检索  
     


Factors affecting the relationship between contractors and their sub-contractors in Saudi Arabia
Authors:Abdulmohsen Al-Hammad
Affiliation:  a College of Environmental Design, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia
Abstract:Delay in contract progress payment, lack of construction quality, errors and delay in shop drawings and/or approval of sample materials were ranked highest as interface problems, whilst legal disputes, scheduling conflicts amongst sub-contractors, geological problems and weather conditions were ranked lowest.
Keywords:construction management  contractors  subcontractors  interface problems  Saudi Arabia
本文献已被 InformaWorld 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号