谈惠南庄泵站电气设备的安装技术 |
| |
引用本文: | 刘大功. 谈惠南庄泵站电气设备的安装技术[J]. 工程建设与设计, 2012, 0(11): 155-158 |
| |
作者姓名: | 刘大功 |
| |
作者单位: | 中国水利水电第七工程局安装分局,四川彭山,620860 |
| |
摘 要: | 惠南庄泵站是南水北调中线总干渠上惟一的一座大型的泵站,是中线北京段实现管涵加压输水的控制性工程,是一座可自流和增压变速高效节能自动化的泵站.论文主要介绍了该泵站内主电动机、变频器、主变压器以及电缆桥架等主要电气设备的安装.
|
关 键 词: | 惠南庄泵站 电气设备 安装 |
Discussion on the Huinanzhuang Pumping Station Electrical Equipment Installation Technology |
| |
Abstract: | The Huinanzhuang Pumping Station is the Mid-route of South-to-North Water Transfer project only a large pumping station,is the central Beijing section of pipe culvert pressurized water control project.Is a gravity and pressure becomes high automation of pumping station,this paper mainly introduces the main motor,frequency converter is within the pump station,main transformer and cable bridge main electrical equipment installation. |
| |
Keywords: | Huinan zhuang pumping station electrical equipment installation |