首页 | 本学科首页   官方微博 | 高级检索  
     


A local-best harmony search algorithm with dynamic sub-harmony memories for lot-streaming flow shop scheduling problem
Authors:Quan-Ke Pan  PN Suganthan  JJ Liang  M Fatih Tasgetiren
Affiliation:1. Institute for Integrated and Intelligent Systems (IIIS), Griffith University, 170 Kessels Rd, Nathan QLD 4111, Australia;2. Department of Mathematical Sciences, Shiraz University of Technology, Shiraz, Iran
Abstract:In this paper, a local-best harmony search (HS) algorithm with dynamic sub-harmony memories (HM), namely DLHS algorithm, is proposed to minimize the total weighted earliness and tardiness penalties for a lot-streaming flow shop scheduling problem with equal-size sub-lots. First of all, to make the HS algorithm suitable for solving the problem considered, a rank-of-value (ROV) rule is applied to convert the continuous harmony vectors to discrete job sequences, and a net benefit of movement (NBM) heuristic is utilized to yield the optimal sub-lot allocations for the obtained job sequences. Secondly, an efficient initialization scheme based on the NEH variants is presented to construct an initial HM with certain quality and diversity. Thirdly, during the evolution process, the HM is dynamically divided into many small-sized sub-HMs which evolve independently so as to balance the fast convergence and large diversity. Fourthly, a new improvisation scheme is developed to well inherit good structures from the local-best harmony vector in the sub-HM. Meanwhile, a chaotic sequence to produce decision variables for harmony vectors and a mutation scheme are utilized to enhance the diversity of the HM. In addition, a simple but effective local search approach is presented and embedded in the DLHS algorithm to enhance the local searching ability. Computational experiments and comparisons show that the proposed DLHS algorithm generates better or competitive results than the existing hybrid genetic algorithm (HGA) and hybrid discrete particle swarm optimization (HDPSO) for the lot-streaming flow shop scheduling problem with total weighted earliness and tardiness criterion.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号