首页 | 本学科首页   官方微博 | 高级检索  
     

白石碾压混凝土坝坝体芯样评定
引用本文:孙道成,李贵智,徐利君,徐仁德. 白石碾压混凝土坝坝体芯样评定[J]. 东北水利水电, 2002, 20(2): 31-32
作者姓名:孙道成  李贵智  徐利君  徐仁德
作者单位:辽宁省辽河防洪工程建设管理局,辽宁沈阳110129
摘    要:白石水库位于辽宁省西部大凌河干流上,采用RCD方法施工。本文通过对坝体碾压混凝土的均质性、密实性、抗渗性、结构强度和层间稳定性的综合评定,证明坝体碾压混凝土符合设计要求,并且达到优良标准。

关 键 词:碾压混凝土重力坝  坝体芯样  质量评定  白石水库
文章编号:1002-0624(2002)2-0031-02
修稿时间:2001-12-06

Evaluation of dam core sampling in Baishi roller compacted concrete dam
SUN Do-cheng,LI Gui-zhi,XU Li-jun,XU Ren-de. Evaluation of dam core sampling in Baishi roller compacted concrete dam[J]. Water Resources & Hydropower of Northeast China, 2002, 20(2): 31-32
Authors:SUN Do-cheng  LI Gui-zhi  XU Li-jun  XU Ren-de
Abstract:The paper proves the roller compacted concrete of Baishi dam accords the design requests and attains excellent standard, through synthetically quality test of dam core sampling including the homogeneity, the compactibility, the impermeability, the structural strength and the interlayer stability.
Keywords:roller compacted concrete dam  dam core sampling  quality test  Baishi reservoir
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号