大涝坝1号构造注水开发地面工艺流程优化
引用本文:杨刚,丁卫平,代维,梁根生,赵吉祥,张玉蕾.大涝坝1号构造注水开发地面工艺流程优化[J].吐哈油气,2011(2).
作者姓名:杨刚  丁卫平  代维  梁根生  赵吉祥  张玉蕾
作者单位:中国石化西北油田分公司雅克拉采气厂;
摘    要:大涝坝1号构造DLK8井注水开发,原地面工艺注水流程存在注水压力高、注水回流量大、撬块震动较大等问题。通过调整柱塞大小、流程优化等经济可行的对策,解决了回流量大、撬块震动过大问题,提高了注水水质,起到了节电增油的效果。为边远井撬装注水流程的开发建设提供了借鉴和参考。

关 键 词:注水开发  柱塞优化  流程优化  节电增油  

Optimization of Surface Technological Process for Water-injectionDevelopment of Dalaoba No.1 Structure
Authors:Yang Gang  Ding Weiping  Dai Wei  Liang Gensheng  Zhao Jixiang  Zhang Yulei
Affiliation:Yang Gang,Ding Weiping,Dai Wei,Liang Gensheng,Zhao Jixiang,Zhang Yulei(Yakala Gas Production Plant,Norehwest Oilfield Company,Sinopec,Kuche 842017,Xinjiang)
Abstract:The well DLK8 in Dalaoba No.1 structure is developed by water injection. The former surface technological process has some problems such as high water-injection pressure, large water-injection backflow and big shake of base. The problems are analyzed and resolved by regulating the size of plunger and optimizing the process, and the quantity of water injection is improved for saving electronic energy and increasing oil production. The results provide some references for the development of other remote well b...
Keywords:water-injection development  plunger optimization  flow optimization  electricity saving and oil production increase  