首页 | 本学科首页   官方微博 | 高级检索  
     

基于Copula函数的水库汛期分期设计
引用本文:谢明江,李继清,沈笛.基于Copula函数的水库汛期分期设计[J].水电能源科学,2014,32(7):56-60.
作者姓名:谢明江  李继清  沈笛
作者单位:华北电力大学 可再生能源学院, 北京 102206;华北电力大学 可再生能源学院, 北京 102206;华北电力大学 可再生能源学院, 北京 102206
基金项目:国家自然科学基金项目(40971300);新疆科技支撑计划(201242170);中央高校业务费重点项目(12ZX04)
摘    要:鉴于水库汛期分期设计是充分利用水库洪水资源的重要手段,以红枫水库为例,在实测系列洪水中加入历史特大洪水,采用超定量方法取样,用混合Von Mises分布拟合洪水发生时间,建立了基于二维Frank Copula函数的洪水发生时间与量级的联合分布,推求分期设计洪水,进而进行了调洪计算,确定了水库汛期分期方式为汛前期(5月1日~5月31日)、主汛期(6月1日~7月31日)、汛末期(8月1日~9月30日),并在满足防洪标准的前提下,确定了各分期汛限水位分别为1 239.1、1 236.5、1 239.6m。

关 键 词:Frank  Copula函数    分期设计洪水    超定量    混合Von  Mises

Application of Copula Function to Reservoir Seasonal Design Flood
XIE Mingjiang,LI Jiqing and SHEN Di.Application of Copula Function to Reservoir Seasonal Design Flood[J].International Journal Hydroelectric Energy,2014,32(7):56-60.
Authors:XIE Mingjiang  LI Jiqing and SHEN Di
Affiliation:School of Renewable Energy, North China Electric Power University, Beijing 102206, China;School of Renewable Energy, North China Electric Power University, Beijing 102206, China;School of Renewable Energy, North China Electric Power University, Beijing 102206, China
Abstract:In view of reservoir flood season staging design is the important way to make full use of the reservoir flood resources. Taking Hongfeng Reservoir as an example, use of the historical flood in observed flood was considered. Mixed Von Mises distribution was used to describe the flood occurrence dates of the Peaks-Over-Threshold (POT) sampling series. Based on two-dimensional Frank Copula function, a joint distribution which considered the flood occurrence dates and magnitudes was established to derive seasonal design flood for flood regulating calculation. The result shows that the flood season of Hongfeng Reservoir may be divided into three sub-seasons, i.e., the early flood season(from May 1 to May 31), the main flood season(from June 1 to July 31), and the late flood season(from August 1 to September 30). On the premise of meet the flood control standard, the limited water level of reservoir by stage respectively is 1 239.1, 1 236.5 and 1 239.6 m.
Keywords:Frank Copula function  seasonal design flood  Peak-Over-Threshold  mixed Von Mises
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号