首页 | 本学科首页   官方微博 | 高级检索  
     

温度变化对小浪底水库排沙洞无粘结预应力衬砌结构应力状态的影响
引用本文:亢景付,王磊.温度变化对小浪底水库排沙洞无粘结预应力衬砌结构应力状态的影响[J].水电能源科学,2014,32(3):145-148,166.
作者姓名:亢景付  王磊
作者单位:天津大学 建筑工程学院, 天津 300072;滨海土木工程结构与安全教育部重点实验室(天津大学), 天津 300072;天津大学 建筑工程学院, 天津 300072;滨海土木工程结构与安全教育部重点实验室(天津大学), 天津 300072
基金项目:国家自然科学基金项目(50979068)
摘    要:小浪底排沙洞是我国第一个采用无粘结预应力混凝土衬砌结构的高压水工隧洞,结合工程运行过程中的观测数据,对温度作用下混凝土应变计的应变变化规律和基于应变监测数据的温度应力计算方法进行了探讨,分析了温度变化对预应力衬砌结构应力状态的影响。结果表明,温度变化对衬砌结构的应力状态会产生比较大的影响,当温度升高时,衬砌中的温度压应力也随之增大;且温度相同时衬砌内侧受到的影响更大。

关 键 词:小浪底水库排沙洞    衬砌结构    无粘结预应力    温度应力    应力状态分析

Stress State of Non-cohesive Prestressed Lining Structure of Xiaolangdi Reservoir Flush Tunnel under Temperature Change
KANG Jingfu and WANG Lei.Stress State of Non-cohesive Prestressed Lining Structure of Xiaolangdi Reservoir Flush Tunnel under Temperature Change[J].International Journal Hydroelectric Energy,2014,32(3):145-148,166.
Authors:KANG Jingfu and WANG Lei
Affiliation:School of Civil Engineering, Tianjin University, Tianjin 300072, China; Key Laboratory of Coast Civil Structure Safety (Tianjin University), Ministry of Education, Tianjin 300072, China;School of Civil Engineering, Tianjin University, Tianjin 300072, China; Key Laboratory of Coast Civil Structure Safety (Tianjin University), Ministry of Education, Tianjin 300072, China
Abstract:Xiaolangdi reservoir flush tunnel is the first high pressure hydraulic lining tunnel that uses the structure of non-cohesive prestressed concrete in China. For studying the stress state of the structure under the temperature change, combined with the observation data during the operation of the project, the change rule of the reading strain and the computing method of temperature stress based on monitoring data under the temperature change are discussed. The stress state of prestressed lining structure under the temperature change are also analyzed. The results indicate that temperature change have a relatively large impact on the stress state of prestressed lining structure; when the value of temperature change increases, the tensile stress of the lining will increase; the temperature has a greater impact on inner lining.
Keywords:Xiaolangdi reservoir flush tunnel  lining structure  non-cohesive prestressed concrete  temperature stress  analysis of stress state
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号