多溶洞地层桩端极限承载力下限有限元法分析
引用本文:梁冠亭,邓利明,肖铭钊,肖开乾,何林.多溶洞地层桩端极限承载力下限有限元法分析[J].长江科学院院报,2020,37(6):94-99.
作者姓名:梁冠亭  邓利明  肖铭钊  肖开乾  何林
作者单位:1.武汉市市政建设集团有限公司 博士后科研工作站, 武汉 430056;2.武汉大学 土木建筑工程学院,武汉 430072
基金项目:湖北省交通运输科技项目计划(2016600111);湖北省建设科技计划项目(20160622)
摘    要:为计算多溶洞地层桩基的极限承载力,通过MatLab平台编制了用于分析多溶洞地层桩端极限承载力下限的有限元法计算程序。采用平面应变模型,并假定材料符合Mohr-Coulomb准则和塑性关联流动法则。定义无量纲参数N来衡量各参数对桩端极限承载力的影响。根据桩与溶洞间的相对位置关系,详细探讨了6种工况下桩端极限承载力的变化规律,并分析了嵌岩深度hr、上覆土层自重qs和溶洞直径D的影响程度。分析结果表明:桩端极限承载力随hr的增大而增大,随D的增大而减小,而qs的影响基本可忽略不计。此外,还对不同工况下桩端的极限破坏模式进行了分析。最后,通过考虑无溶洞、有溶洞下的2种桩基算例,验证了本文方法的正确性。

关 键 词:多溶洞桩基  桩端极限承载力  MatLab平台  下限有限元法  破坏模式  
收稿时间:2018-12-13

Lower Bound Limit Element Analysis on Bearing Capacity of Pile Foundation above Karst Caves
LIANG Guan-ting,DENG Li-ming,XIAO Ming-zhao,XIAO Kai-qian,HE Lin.Lower Bound Limit Element Analysis on Bearing Capacity of Pile Foundation above Karst Caves[J].Journal of Yangtze River Scientific Research Institute,2020,37(6):94-99.
Authors:LIANG Guan-ting  DENG Li-ming  XIAO Ming-zhao  XIAO Kai-qian  HE Lin
Affiliation:1. Post-doctoral Research Center, Wuhan Municipal Construction Group Co. , Ltd. , Wuhan 430056, China;2. School of Civil Engineering, Wuhan University, Wuhan 430072, China
Abstract:The procedures of calculating the limit bearing capacity of pile foundation above karst caves are provided in this paper based on MatLab using the theorem of the lower bound solution with finite element method. A plain strain model in no consideration of 3D space effect is built with the rock mass material assumed to obeying the Mohr-Coulomb criterion with plastic associated flow rule. A dimensionless parameter N is defined to describe the effect of different parameters on the bearing capacity of pile foundation. According to the position relation between piles and karst caves, the variation of limit bearing capacity of pile foundation in six different cases are examined in detail. The influences of rock-socketed pile depth hr, self-weight qs of overlying soil, and diameter D of karst caves on the bearing capacity of pile foundation are also investigated. Results reveal that the limit bearing capacity of pile foundation increases with the increase of hr, but decreases with increasing of D, while the influence of qs is negligible. In addition, the failure modes of pile foundation in different cases are also analyzed. The computation method in this paper is verified correct through two examples in the presence and in the absence of karst caves.
Keywords:pile foundation above karst caves  limit bearing capacity  MatLab  lower bound  finite element method  failure mode  
本文献已被 CNKI 等数据库收录!
点击此处可从《长江科学院院报》浏览原始摘要信息
点击此处可从《长江科学院院报》下载全文