首页 | 本学科首页   官方微博 | 高级检索  
     

埋深对软弱隧道围岩破坏影响机制试验研究
引用本文:汪成兵,朱合华. 埋深对软弱隧道围岩破坏影响机制试验研究[J]. 岩石力学与工程学报, 2010, 29(12): 2442-2448
作者姓名:汪成兵  朱合华
作者单位:(1. 中国建筑科学研究院 地基基础研究所,北京 100013;2. 同济大学 地下建筑与工程系,上海 200092;
3. 同济大学 岩土及地下工程教育部重点实验室,上海 200092)
基金项目:国家自然科学基金资助项目
摘    要:通过室内模型试验,研究公路隧道IV,V级围岩在不同埋深条件下全断面开挖时的围岩破坏情况,实现自重应力场作用下毛洞状态时隧道围岩破坏过程的试验模拟,得到拱形塌方和塌穿型塌方2种围岩破坏模式。试验结果表明:隧道围岩的破坏从拱顶开始,并逐渐向上发展;埋深越小,隧道越易发生塌穿型塌方,而当埋深小于某一值时,因隧道开挖后围岩应力未超过围岩强度,隧道反而能保持稳定状态;对塌穿型塌方,隧道埋深越大,开挖后围岩维持稳定时间越短,塌方程度越严重,塌方向地表发展得越快;对同一类型的塌方,隧道埋深越大,塌方后隧道周边应力变化幅度越大。

关 键 词:隧道工程  公路隧道  埋深  围岩破坏  模型试验
收稿时间:2010-05-10;

EXPERIMENTAL STUDY OF INFLUENCE MECHANISM OF BURIED DEPTH ON SURROUNDING ROCK FAILURE OF TUNNEL CONSTRUCTED IN SOFT ROCK
WANG Chengbing,ZHU Hehua. EXPERIMENTAL STUDY OF INFLUENCE MECHANISM OF BURIED DEPTH ON SURROUNDING ROCK FAILURE OF TUNNEL CONSTRUCTED IN SOFT ROCK[J]. Chinese Journal of Rock Mechanics and Engineering, 2010, 29(12): 2442-2448
Authors:WANG Chengbing  ZHU Hehua
Affiliation:(1. Institute of Foundation Engineering,China Academy of Building Research,Beijing 100013,China;2. Department of Geotechnical Engineering,Tongji University,Shanghai 200092,China;3. Key Laboratory of Ministry of Education for Geotechnical and Underground Engineering,Tongji University,Shanghai 200092,China)
Abstract:The failure conditions of grades IV and V surrounding rocks in highway tunnel under different buried depths are studied through a number of model tests. The test simulation of failure process of non-supported tunnel under gravitational stress is carried out successfully;and two failure modes of arch collapse and caving collapse are obtained. The test results show that the failure of surrounding rock initiates from arch crown of tunnel and develops upward progressively. The smaller the buried depth is,the more likely the caving collapse occurs. When the buried depth is less than a certain value,the tunnel can maintain stability because the stress of surrounding rock induced by excavation does not exceed the strength of surrounding rock. For the caving collapse,the larger the buried depth is,the shorter the time of surrounding rock¢s stability is,the more serious the collapse degree is,and also the faster the collapse developing to ground surface is. For the same collapse type,the larger the buried depth is,the larger the changing amplitude of the stress of surrounding rock is.
Keywords:tunnelling engineering  highway tunnel  buried depth  failure of surrounding rock  model test
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《岩石力学与工程学报》浏览原始摘要信息
点击此处可从《岩石力学与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号