乐滩水电站一期施工导流设计
引用本文:林强光.乐滩水电站一期施工导流设计[J].红水河,2004,23(3):27-29,43.
作者姓名:林强光
作者单位:广西电力工业勘察设计研究院,广西,南宁,530023
摘    要:介绍乐滩水电站一期工程的导流标准、导流方案、导流建筑物布置和设计等,指出采用一期围厂房加部分溢流坝的大基坑全年围堰导流方案,可避免单独作一道厂房纵向围堰时遇到堰脚临空的问题,施工布置顺畅,能减轻二期施工压力,实践证明该方案是合理的。

关 键 词:施工导流  围堰  设计  乐滩水电站
文章编号:1001-408X(2004)03-0027-04

Design of Construction Diversion in Phase I of Letan Hydropower Project
LIN Qiang-guang.Design of Construction Diversion in Phase I of Letan Hydropower Project[J].Hongshui River,2004,23(3):27-29,43.
Authors:LIN Qiang-guang
Abstract:Introduces the diversion standard, diversion scheme, layout and design of diversion structure in the Phase I of Letan hydropower project. The diversion by the Phase I cofferdam together with part of spillway is reasonable, which provides a smooth layout and releases the space limit in Phase II construction, and the problem of cofferdam foundation hanging in the air is solved.
Keywords:construction diversion  cofferdam  design  Letan hydropower station