深水无隔水管泥浆举升钻井系统配置及安装流程
引用本文:王国栋,陈国明,殷志明,许亮斌,蒋世全.深水无隔水管泥浆举升钻井系统配置及安装流程[J].石油矿场机械,2012(11):11-15.
作者姓名:王国栋  陈国明  殷志明  许亮斌  蒋世全
作者单位:[1]中国石油大学海洋油气装备与安全技术研究中心,山东东营257061 [2]中海油研究总院,北京100027
基金项目:国家科技重大专项课题“深水油气田开发钻完井工程配套技术”(2008ZX05026-001-12)
摘    要:在对深水无隔水管泥浆举升钻井系统关键设备和水力学计算结果分析的基础上,提出了水深500m和1 500m情况下的无隔水管泥浆举升系统配置方案。针对不同水深情况,给出系统布放方案选择的原则,提出舷侧布放和月池布放2种方案,并对不同布放方案的优缺点进行分析。结合目前无隔水管泥浆举升钻井工艺应用情况,对不同水深情况下系统安装的平台准备和水下设备下入流程进行分析。通过对无隔水管泥浆举升钻井系统与现有海洋装备的匹配及其配置与安装流程制定的研究,对于经济有效地达到钻井目标具有重要指导意义。

关 键 词:深水  无隔水管泥浆举升钻井  系统配置  布放方案  安装流程

Configuration and Installation Procedures for Deepwater Riserless Mud Lift Drilling System
WANG Guo-dong,CHEN Guo-ming,YIN Zhi-ming,XU Liang-bin,JIANG Shi-quan.Configuration and Installation Procedures for Deepwater Riserless Mud Lift Drilling System[J].Oil Field Equipment,2012(11):11-15.
Authors:WANG Guo-dong  CHEN Guo-ming  YIN Zhi-ming  XU Liang-bin  JIANG Shi-quan
Affiliation:1.Centre for Offshore Engineering and Safety Technology,China University of Petroleum, Dongying 257061,China;2.CNOOC Research Institute,Beijing 100027,China)
Abstract:Based on the analysis of the essential equipments and hydraulic calculation results of the deepwater non-riser mud recovery system,this paper presented the respective configuration of the non-riser mud recovery system in the case of the water depth is 500 m and 1500 m.With deliberation on the different water depth,the paper presented two arrangement deployments,over-the-side and moon pool deployments,and analyzed the advantages and disadvantages of these two arrangement deployments.Combined with the development of the non-riser mud recovery drilling system,a study of rig preparation and procedures of subsea equipments installation was made,considering the difference of water depth.According the research of the machine of the non-riser mud recovery drilling system and existing offshore drilling equipments,this paper has important directive significance for the achievement of deepwater drilling objective.
Keywords:deepwater  non-riser mud lift drilling  system configuration  installation procedures