首页 | 本学科首页   官方微博 | 高级检索  
     


OO Information Model for Construction Project Management
Authors:Asim Karim  Hojjat Adeli
Affiliation:11Grad. Res. Assoc., Dept. of Civ. and Envir. Engrg. and Geodetic Sci., Ohio State Univ., Columbus, OH 43210.
22Prof., Dept. of Civ. and Envir. Engrg. and Geodetic Sci., 470 Hitchcock Hall, 2070 Neil Ave., Columbus, OH.
Abstract:Recently, the writers developed a general and powerful mathematical model for scheduling construction projects. An optimization formulation was presented with the goal of minimizing the direct construction cost. The nonlinear optimization problem was solved by the recently patented neural dynamics model of Adeli and Park. In this paper an object-oriented (OO) information model is presented for construction scheduling, cost optimization, and change order management (CONSCOM) based on the new construction scheduling model. The goal is to lay the foundation for a new generation of flexible, powerful, maintainable, and reusable software system for the solution of construction scheduling problems. The model is presented as a domain-specific development framework using the Microsoft Foundation Class library and utilizing the software reuse feature of the framework. The framework reuse architecture is more flexible and powerful than other reuse techniques such as components and patterns. A companion paper presents the implementation of the OO information model in a prototype software system for management of construction projects, called CONSCOM.
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号