首页 | 本学科首页   官方微博 | 高级检索  
     

武山铜矿主井系统延深改造及效果浅析
引用本文:郭向东.武山铜矿主井系统延深改造及效果浅析[J].金属矿山,2002(1):22-25.
作者姓名:郭向东
作者单位:南昌有色冶金设计研究院
摘    要:武山铜矿主井延深时根据新的采、选工艺要求,在前期工程的基础上,对其箕斗提升系统进行改造,增设坑内破碎。针对该矿特粘的矿石性质和前期工程遗留问题,在具体设计和实施过程中采取特别措施保证系统通畅和安全并注意节省投资。同时对尚存在的问题也提出了新的思考。

关 键 词:箕斗  安全间隙  溜井  矿井  提升系统  铜矿  延深  改造  5
修稿时间:2001年9月10日

Preliminary Discussion on the Reform of the Deepening of the Main Shaft System at Wushan Copper Mine and Its Effect
Guo Xiangdong.Preliminary Discussion on the Reform of the Deepening of the Main Shaft System at Wushan Copper Mine and Its Effect[J].Metal Mine,2002(1):22-25.
Authors:Guo Xiangdong
Affiliation:Nanchang Nonferrous Metallurgical Designing Research Institute
Abstract:In accordance with the requirements of new mining and mineral processing technologies in the main shaft deepening at Wushan Copper Mine and on the basis of the former project,the skip hoisting system was reformed and in pit crushing added.In view of the very sticky ore of this mine and the problems left by the former project,special measures were taken in the specific design and implementation process to ensure a clear and safe system while paying attention to the investment saving.Meanwhile,new consideration was made on the existing problems.
Keywords:Skip shaft  Safety space  In  pit crushing  Ore pass
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号