首页 | 本学科首页   官方微博 | 高级检索  
     


The OPIT system II. Job control and scheduling for large applications programs
Authors:David F Brailsford  John A Prentice
Affiliation:Department of Mathematics, University of Nottingham, Nottingham NG7 2RD, UK;Computer Centre, Loughborough University of Technology, Loughborough, UK
Abstract:A strategy is described for a controlling algorithm (‘the job’) to schedule and supply many data sets (‘problems’) to a large, long-running applications program. The algorithm also controls very closely the run time environment of each problem and provides protection against breakdown of the computer or its operating system. The principles described are applicable on any computer with a sufficiently flexible operating system. The particular example used here is the running of the OPIT Program (see paper I page 123) on an ICL 1900 Computer with the GEORGE 3 operating system.
Keywords:
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号