复杂水文地质条件下高压隧洞围岩高压固结灌浆处理
引用本文:廖品忠,吴国荣.复杂水文地质条件下高压隧洞围岩高压固结灌浆处理[J].资源环境与工程,2011(5):488-491.
作者姓名:廖品忠  吴国荣
作者单位:广东省水利电力勘测设计研究院;
摘    要:惠州抽水蓄能电站高压隧洞发育断层以张性、张扭性为主,断层透水性较强.高压隧洞一带NE向和NW、NNW向断层构成复杂的透水性好的网络,水文地质条件复杂.高压隧洞开挖洞径10 m,内水静水压力172~627 m,采用限裂钢筋混凝土薄衬砌,衬砌厚度60 cm,设计理念先进.防止高压隧洞内水大量外渗带来的危害是工程成功的关键....

关 键 词:复杂水文地质条件  高压隧洞  高压固结灌浆  惠州抽水蓄能电站

High Pressure Reinforcement Grouting of Surrounding Rock of High Pressure Tunnel under Complex Hydrogeological Condition
LIAO Pinzhong,WU Guorong.High Pressure Reinforcement Grouting of Surrounding Rock of High Pressure Tunnel under Complex Hydrogeological Condition[J].Resources Environment & Engineering,2011(5):488-491.
Authors:LIAO Pinzhong  WU Guorong
Affiliation:LIAO Pinzhong,WU Guorong (Guangdong Hydropower Planning and Design Institute,Guangzhou,Guangdong 510635)
Abstract:The fault developed in high pressure tunnel of Huizhou pumped storage power station is mainly tensional fault and shear fault with strong permeability.The fault along NE direction and NW/NNW direction forms a complex network with good permeability and complex hydrogeological condition.The excavation diameter of high pressure tunnel is 10 m,the hydrostatic pressure of internal water is 172~627 m.The tunnel adopts advanced design concept with thin lining of crack prevention reinforced concrete and lining thic...
Keywords:complex hydrogeological condition  high pressure tunnel  high pressure reinforcement grouting  Huizhou pumped storage power station  