首页 | 本学科首页   官方微博 | 高级检索  
     


Hydraulic Design and Preliminary Performance Evaluation of Countermeasure against Debris Accumulation and Resulting Local Pier Scour on River Po in Italy
Authors:Silvio Franzetti  Alessio Radice  Marcello Rabitti  Giuliano Rossi
Affiliation:1Professor, Dept. I.I.A.R., Politecnico di Milano, Piazza Leonardo da Vinci, 32, 20133 Milano, Italy.
2Assistant Professor, Dept. I.I.A.R., Politecnico di Milano, Piazza Leonardo da Vinci, 32, 20133 Milano, Italy (corresponding author). E-mail: alessio.radice@polimi.it
3Head, Settore Progettazione della Viabilità e delle Infrastrutture, Provincia di Mantova, Via Principe Amedeo, 30, 46100 Mantova, Italy.
4Engineer, Settore Progettazione della Viabilità e delle Infrastrutture, Provincia di Mantova, Via Principe Amedeo, 30, 46100 Mantova, Italy.
Abstract:This paper presents a protection structure built for a bridge pier consisting of six narrow piles. Accumulation of large woody debris upstream of the pile group during high-flow terms might have induced much larger scour depths compared with those expected for the single pile. A phenomenological sketch of the system suggested that accumulation of debris material during peak flows and subsequent descent of the same material during the tail of the events represented a very dangerous two-stage process owing to the high expected scour. Consequently, a countermeasure was designed, consisting of a plate preventing the descent of debris below its elevation. The performance of the plate in reducing local scour was subjected to some preliminary laboratory tests, and satisfactory results were obtained. This paper reports some tentative performance observations for the real structure built on the river, based on the amount of debris trapped during a recent event with moderate flow.
Keywords:Bridges  Scour  Piers  Debris  Hydraulic design  Italy  
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号