首页 | 本学科首页   官方微博 | 高级检索  
     

考虑地震与溃坝洪水共同作用的土石坝坝坡稳定分析方法
引用本文:陈玺,孙平,李守义,冯上鑫,黎康平.考虑地震与溃坝洪水共同作用的土石坝坝坡稳定分析方法[J].水利学报,2017,48(12):1499-1505.
作者姓名:陈玺  孙平  李守义  冯上鑫  黎康平
作者单位:西安理工大学 水利水电学院, 陕西 西安 710048,中国水利水电科学研究院 岩土工程研究所, 北京 100048,西安理工大学 水利水电学院, 陕西 西安 710048,西安理工大学 水利水电学院, 陕西 西安 710048,西安理工大学 水利水电学院, 陕西 西安 710048
基金项目:国家重点研发计划课题(2016YFC0401804);国家自然科学基金项目(51709282);国家重点基础研究发展计划(973计划)(2013CB036403)
摘    要:地震与洪水作用是影响土石坝坝坡稳定的主要因素,在梯级水库中,上游溃坝洪水的影响尤为显著。以上一梯级溃坝洪水引起的坝前水位变化模拟洪水作用,提出在毕肖普法基础上,考虑坝体材料变异系数,大坝遭遇上游溃坝洪水与地震共同作用时的坝坡稳定分析方法。以"卜寺沟-双江口"两梯级为例,假定卜寺沟发生溃坝,进行下游梯级"双江口"下游坝坡稳定的可靠度风险分析。计算结果表明,双江口在遭遇上游溃坝洪水和地震的极端情况下,下游坝坡失效概率为1.571×10~(-6),对应的可靠度指标为4.667,满足规范对I级建筑物发生二类破坏的要求。

关 键 词:梯级水库  溃坝洪水  地震  坝坡稳定分析  可靠度指标
收稿时间:2017/8/11 0:00:00

Analysis method for the slope stability of earth-rock fill dam considering the effect of concurrent earthquake and dam-break flood
CHEN Xi,SUN Ping,LI Shouyi,FENG Shangxin and LI Kangping.Analysis method for the slope stability of earth-rock fill dam considering the effect of concurrent earthquake and dam-break flood[J].Journal of Hydraulic Engineering,2017,48(12):1499-1505.
Authors:CHEN Xi  SUN Ping  LI Shouyi  FENG Shangxin and LI Kangping
Affiliation:College of Water Resources and Hydro-electric Engineering, Xi''an University of Technology, Xi''an 710048, China,Department of Geotechnical Engineering, China Institute of Water Resources and Hydropower Research, Beijing 100048, China,College of Water Resources and Hydro-electric Engineering, Xi''an University of Technology, Xi''an 710048, China,College of Water Resources and Hydro-electric Engineering, Xi''an University of Technology, Xi''an 710048, China and College of Water Resources and Hydro-electric Engineering, Xi''an University of Technology, Xi''an 710048, China
Abstract:Earthquake and flood are the major factors which affect the slope stability of earth-rock fill dam in cascade reservoirs, and the effect of dam-break flood from upstream is especially remarkable. Analysis method was put forward for the earth-rock fill dam slope stability considering the effect of concurrent earthquake and dam-break flood. The method is based on the Bishop method, considering the variation coefficient of dam material, and the effect of dam-break flood is modeled by the fluctuation of dam front water level. Taking "Busigou-Shuangjiangkou" two ascades as an example, the dam slope stability and the risk of the downstream cascade dam slope of "Shuangjiangkou" were analyzed. The results show that, under the extreme condition of dam-break flood from upstream and earthquake, the downstream dam slope failure probability is 1.571×10-6, and the corresponding reliability index is 4.667. The stability meets the standard requirements for the second class destruction of the first-grade structure.
Keywords:cascade reservoirs  dam-break flood  earthquake  dam slope stability analysis  reliability index
本文献已被 CNKI 等数据库收录!
点击此处可从《水利学报》浏览原始摘要信息
点击此处可从《水利学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号