上海世博会中国馆关键施工技术
引用本文:顾靖. 上海世博会中国馆关键施工技术[J]. 上海建设科技, 2009, 0(5): 42-45
作者姓名:顾靖
作者单位:上海市第四建筑有限公司
摘    要:
中国馆的超大型基坑邻近并局部跨越运营中的地铁8号线;其钢结构从33m起层层外挑,最大达36m。为此,土建施工采取措施解决了基坑施工、筒体结构施工和异形内倾幕墙安装工艺等关键施工技术,使中国馆这一特殊结构得以保质、保量、安全顺利地竣工。

关 键 词:上海世博会  中国馆  施工  基坑  筒体结构

Key Construction Technique for China Pavilion of Shanghai 2010 Expo
GU Jing. Key Construction Technique for China Pavilion of Shanghai 2010 Expo[J]. Shanghai Construction Science & Technology, 2009, 0(5): 42-45
Authors:GU Jing
Abstract:
The super-large deep foundation pit for China Pavilion is adjacent to and crossover partially No. 8 metro, whose steel structure is stacked outside from 33 m layer by layer, reaching to 36 m. Several key construction techniques, for instance, the foundation pit construction, tube structure con- struction and shaped introversion curtain wall installation were applied to make China Pavilion constructed safely and smoothly.
Keywords:Shanghai Expo 2010 China Pavilion construction foundation pit tube structure