首页 | 本学科首页   官方微博 | 高级检索  
     


Differentiated preemptive dispatching for automatic materials handling services in 300 mm semiconductor foundry
Authors:Da-Yin Liao  Chia-Nan Wang
Affiliation:1. Department of Information Management, National Chi-Nan University, No. 1 University Rd. Puli, Nantou Hsien, 545, Taiwan
2. Institute of Business and Management, Yuanpei University of Science and Technology, No. 306 Yuanpei Rd., Hsinchu, 30015, Taiwan
Abstract:Highly automated materials handling in 300 mm semiconductor manufacturing is one of the biggest concerns to foundry practitioners because effective coordination among efficient manual operations has been the core competence in their 200 mm manufacturing successful stories. It is still very challenging to provide almost no-wait transport to hot lots (high priority lots) in an automatic materials handling production environment. This paper proposes an effective overhead hoist transport (OHT) dispatching rule, differentiated preemptive dispatching (DPD) policy, to reduce the possible blocking effects during the transportation of hot lots in a 300 mm OHT system. The dispatching objective is to minimize the delivery time of hot lots while minimizing the impact to the transport of normal lots. Simulation experiments based on realistic data from a local 300 mm foundry fab are conducted. Numerical results demonstrate that the DPD rule can effectively expedite the movements of hot lots. The proposed DPD rule is very useful to hot lots management and shop floor control functions, like scheduling and dispatching, in a 300 mm fab-wide automated production environment.
Keywords:
本文献已被 SpringerLink 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号