The impact of increased interconnection on electricity systems with large penetrations of wind generation: A case study of Ireland and Great Britain |
| |
Authors: | E. Denny,A. Tuohy,P. Meibom,A. Keane,D. Flynn,A. Mullane,M. O&rsquo Malley |
| |
Affiliation: | 1. Department of Economics, Trinity College Dublin, Dublin 2, Ireland;2. University College Dublin, Ireland;3. RISØ DTU, Technical University of Denmark, Denmark;4. ECAR Energy Ltd., Ireland |
| |
Abstract: | Increased interconnection has been highlighted as potentially facilitating the integration of wind generation in power systems by increasing the flexibility to balance the variable wind output. This paper utilizes a stochastic unit commitment model to simulate the impacts of increased interconnection for the island of Ireland with large penetrations of wind generation. The results suggest that increased interconnection should reduce average prices in Ireland, and the variability of those prices. The simulations also suggest that while increased interconnection may reduce carbon dioxide emissions in Ireland, Great Britain would experience an increase in emissions, resulting in total emissions remaining almost unchanged. The studies suggest that increased interconnection would not reduce excess wind generation. This is because under unit commitment techniques which incorporate wind power forecasts in the scheduling decisions, wind curtailment is minimal even with low levels of interconnection. As would be expected an increase in interconnection should improve system adequacy considerably with a significant reduction in the number of hours when the load and reserve constraints are not met. |
| |
Keywords: | Interconnection Wind power generation Power system operation |
本文献已被 ScienceDirect 等数据库收录! |
|