适应基础均匀沉降的高度可调铁塔结构设计及试验研究
引用本文:李淮海,王璋奇,李恒遥,梁伟,安利强.适应基础均匀沉降的高度可调铁塔结构设计及试验研究[J].电网技术,2007,31(19):83-86.
作者姓名:李淮海  王璋奇  李恒遥  梁伟  安利强
作者单位:1. 安徽省电力公司淮北供电公司,安徽省,淮北市,235000
2. 华北电力大学机械工程系,河北省,保定市,071003
摘    要:针对采煤区输电线路运行及设计中存在的地基塌陷问题,提出适应于基础均匀沉降的高度可调铁塔设计思路和理念,并完成了高度可调KTZM110猫头直线塔的设计方案;建立了高度可调KTZM110猫头直线塔的有限元分析模型,对不同载荷工况下高度可调铁塔的变形和应力进行分析计算,其强度满足设计规范的要求;根据设计图纸,加工制造全尺寸的真型铁塔,并进行铁塔的型式试验,试验结果表明,该型铁塔的设计方案能够满足强度和刚度的要求,达到了设计目的,可在运行线路上使用。

关 键 词:铁塔  高度可调  自立式  采煤塌陷区  电力建设
文章编号:1000-3673(2007)19-0083-04
修稿时间:2007-08-02

Structural Design and Experimental Investigation of Transmission Tower with Adjustable Height in Adaptation to Uniform Foundation Settlement
LI Huai-hai,WANG Zhang-qi,LI Heng-yao,LIANG Wei,AN Li-qiang.Structural Design and Experimental Investigation of Transmission Tower with Adjustable Height in Adaptation to Uniform Foundation Settlement[J].Power System Technology,2007,31(19):83-86.
Authors:LI Huai-hai  WANG Zhang-qi  LI Heng-yao  LIANG Wei  AN Li-qiang
Affiliation:1. Huaibei Power Supply Company, Anhui Electric Power Corporation, Huaibei 235000, Anhui Province, China; 2. Department of Mechanical Engineering, North China Electric Power University, Baoding 071003, Hebei Province, China
Abstract:To solve the problem of foundation collapse existing in the design and operation of transmission lines located in coal-mining fields, the authors propose a new design idea for transmission tower with adjustable height in adaptation to uniform foundation settlement, and a design scheme for KTZM110 cathead tangent tower with adjustable height is accomplished. A finite element analysis model for KTZM110 cathead tangent tower with adjustable height is established; the analysis and calculation results of deformation and stress of tower with adjustable height under different loading conditions show that the intensity of KTZM110 cathead tangent tower conforms to the requirement of design code. According to the design graph, a tower with real size is manufactured and the type testing of the tower is carried out. Type testing results show that the design scheme of KTZM110 cathead tangent tower can meet the requirement of intensity and rigidity, the design purpose is achieved and this kind of cathead tangent tower can be adopted in transmission lines being operated.
Keywords:transmission tower  height adjustable  free-standing  mining subsidence  electric power construction