首页 | 本学科首页   官方微博 | 高级检索  
     

铁水全脱硫改造推荐方案
引用本文:欧阳守忠.铁水全脱硫改造推荐方案[J].武钢技术,2000,38(3):48-51.
作者姓名:欧阳守忠
作者单位:武钢技术中心
摘    要:分析讨论了武钢第二炼钢厂实现铁水全脱硫处理,确定新建铁水脱硫站地址,选择工艺工艺设备和脱硫剂的开发应用等方面的问题,并推荐了一种适合该厂具体条件的建设笥方案。

关 键 词:铁水脱硫  工艺方案  技术改造  脱硫剂

RECOMMENDED PLAN FOR INNOVATION ON FULL HOT METAL DESULPHURIZATION
Ouyang Shouzhong.RECOMMENDED PLAN FOR INNOVATION ON FULL HOT METAL DESULPHURIZATION[J].Wisco Technology,2000,38(3):48-51.
Authors:Ouyang Shouzhong
Affiliation:Technology Center
Abstract:The present paper discussed problems concerning realization of full desulphurization of hot metal in the No.2 Steel Plant of WISCO,determination of the location of the newly built hot metal desulphurization station,selection of operating process and equipments and development and application of desulphurizer,and recommended a constructive plan which is suitable for the specific conditions of the plant.
Keywords:hot metal desulphurization  process plan  technical innovation
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号