首页 | 本学科首页   官方微博 | 高级检索  
     


Sampling period scheduling of networked control systems with multiple-control loops
Authors:Chen Peng  Dong Yue  Zhou Gu  Feng Xia
Affiliation:1. School of Electrical and Automation Engineering, Nanjing Normal University, Nanjing, Jiangsu 210042, China;2. College of Power Engineering, Nanjing Normal University, Nanjing, Jiangsu 210042, China;3. College of Computer Science and Technology, Zhejiang University, Hangzhou 310027, China;4. Department of Control Science and Engineering, Huazhong University of Science and Technology, Wuhan, Hubei 430074, China
Abstract:This paper addresses the sampling period scheduling of Networked Control Systems (NCSs) with multiple control loops. The generalized exponential function is employed to describe Integral Absolute Error (IAE) performance versus sampling period by Truetime toolbox under Matlab environment, and the sampling periods are scheduled to obtain the optimal integrated performance based on Kuhn–Tucker Theorem, which are subject to the stability of every control loop and the bandwidth on available network resource. Numerical examples are given to show the effectiveness of our method.
Keywords:Sampling period scheduling  Kuhn&ndash  Tucker theorem  Networked control systems (NCSs)  Optimization
本文献已被 ScienceDirect 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号