首页 | 本学科首页   官方微博 | 高级检索  
     

石塘水电站直流系统的改造
引用本文:周丰兴,任乐鸣,吴建新,舒锦宏,陈农. 石塘水电站直流系统的改造[J]. 水电自动化与大坝监测, 2002, 26(6): 67-68
作者姓名:周丰兴  任乐鸣  吴建新  舒锦宏  陈农
作者单位:紧水滩水力发电厂,浙江省丽水市,323600
摘    要:
针对石塘水电站直流系统在设计思路,接线方式、设备等方面存在的问题,应用微机控制与检测技术,对直流系统的接线方式,接地检测,监测蓄电池等进行了改造,对于直流系统的安全稳定和经济运行具有重要意义。

关 键 词:石塘水电站 直流系统 接线方式
修稿时间:2002-04-12

REFORM OF DC SYSTEM AT SHITANG HYDROPOWER STATION
Zhou Fengxing,Ren Leming,Wu Jianxin,Shu Jinhong,Chen Nong. REFORM OF DC SYSTEM AT SHITANG HYDROPOWER STATION[J]. HYDROPOWER AUTOMATION AND DAM MONITORING, 2002, 26(6): 67-68
Authors:Zhou Fengxing  Ren Leming  Wu Jianxin  Shu Jinhong  Chen Nong
Abstract:
In consideration of the existing problems of DC system at the Shitang Hydropower Station, such as in the idea of design , the mode of connection, and the performance of equipment, the reform of the DC system is implemented with the technology of computer control and detection. The reform involves the connection mode, the grounding mode of inspection, the monitoring of accumulator, and so on. The reform is of great significance to the stability and economical operation of the DC system.
Keywords:hydropower station  DC system  connection mode  
本文献已被 CNKI 维普 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号