首页 | 本学科首页   官方微博 | 高级检索  
     

基于鲁棒优化的电-气互联型主动配电网故障恢复方法
引用本文:刘家权,刘 珅,周金涛,李亚国,赵丽萍.基于鲁棒优化的电-气互联型主动配电网故障恢复方法[J].电力系统保护与控制,2021,49(7):66-74.
作者姓名:刘家权  刘 珅  周金涛  李亚国  赵丽萍
作者单位:国网重庆电力有限公司,重庆 400000;国网冀北电力有限公司,北京 100000;国网冀北电力有限公司 智能配电网中心,河北 秦皇岛 066100;国网山西省电力有限公司,山西 太原 030021;国网冀北电力有限公司张家口供电公司,河北 张家口075001
基金项目:国家自然科学基金项目资助(61873225);河北省自然科学基金京津冀合作专项项目资助(F2016203507)
摘    要:电-气互联型主动配电网作为能源利用的重要形式,其故障恢复对于提升系统供电可靠性至关重要。针对电-气互联型主动配电网故障恢复问题,计及系统不确定性采用鲁棒优化理论建立故障恢复方法。模型以风光出力和故障恢复方案分别为自然决策者和系统决策者,令两者进行博弈。其中以最大化失电负荷量为目标函数,计及区间形式不确定性约束建立自然决策者模型。以最小化失电负荷量,计及电气互联约束、电能网络辐射状约束,功率平衡约束、电能网络运行约束建立系统决策者模型。基于两阶段松弛法设计故障恢复鲁棒优化模型的求解步骤。最后通过一个算例验证了所建立模型的有效性。

关 键 词:电-气互联  主动配电网  故障恢复  鲁棒优化  两阶段松弛法
收稿时间:2020/6/1 0:00:00
修稿时间:2020/12/23 0:00:00

Fault recovery method of an integrated electricity and natural-gas active distribution network based on robust optimization
LIU Jiaquan,LIU Shen,ZHOU Jintao,LI Yaguo,ZHAO Liping.Fault recovery method of an integrated electricity and natural-gas active distribution network based on robust optimization[J].Power System Protection and Control,2021,49(7):66-74.
Authors:LIU Jiaquan  LIU Shen  ZHOU Jintao  LI Yaguo  ZHAO Liping
Affiliation:1. State Grid Chongqing Electric Power Corporation, Chongqing 400000, China; 2. State Grid Jibei Electric Power Corporation, Beijing 100000, China; 3. Smart Distribution Network Center, State Grid Jibei Electric Power Corporation, Qinhuangdao 066100, China; 4. State Grid Shanxi Electric Power Corporation, Taiyuan 030021, China; 5. Zhangjiakou Power Supply Company, State Grid Jibei Electric Power Corporation, Zhangjiakou 075001, China
Abstract:Fault recovery in an integrated electricity and natural-gas Active Distribution Network (ADN) is very important for improving the reliability of the system. To solve the problem of fault recovery in an integrated electricity and natural-gas ADN, a robust optimization theory is used considering system uncertainty. In the model, the wind photovoltaic output and the fault recovery scheme are considered as natural decision-makers and system decision-makers respectively to make them game. The natural decision-maker model is established with maximizing the power loss load as the objective function, taking into account the uncertainty constraints of the interval form; the system decision-maker model is established with minimizing the power loss load, taking into account the constraints of electricity and natural-gas integration, and radiation, power balance and operation constraints of the electrical energy network. Based on a two-stage relaxation method, the solution steps for the robust optimization model are designed. Finally, an example is given to verify the validity of the model. This work is supported by the National Natural Science Foundation of China (No. 61873225) and the Beijing- Tianjin-Hebei Cooperation Special Program of Natural Science Foundation of Hebei Province (No. F2016203507).
Keywords:Fault recovery method of an integrated electricity and natural-gas active distribution  network based on robust optimization
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《电力系统保护与控制》浏览原始摘要信息
点击此处可从《电力系统保护与控制》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号