首页 | 本学科首页   官方微博 | 高级检索  
     

小间距平行盾构隧道施工的反分析研究
引用本文:李晓霖,郭婷,惠丽萍. 小间距平行盾构隧道施工的反分析研究[J]. 地下空间与工程学报, 2014, 10(3): 641-649
作者姓名:李晓霖  郭婷  惠丽萍
作者单位:1.北京工业大学,北京 100022;2.北京城建设计研究总院有限责任公司,北京 100037
基金项目:本文依托的研究项目《北京地铁小间距长距离盾构隧道设计与施工关键技术研究》获2008年北京市科学技术奖三等奖
摘    要:
结合北京地铁十号线三元桥站~亮马河站区间盾构隧道工程,提出了根据监测数据对两条盾构隧道小间距、长距离并行施工相互影响进行反分析的方法,并根据工程实施过程中的监测数据,分别对盾构隧道环向和纵向的内力进行了分析,指导了施工。研究表明,当两条盾构隧道小间距、长距离并行施工时,会出现后行盾构隧道对先行隧道先挤压、后卸载的情况,引起先行隧道环向的内力变化,与实际监测的数据吻合。该研究方法及工程实践结论可以为地铁类似工程的设计、施工、监测提供参考。

关 键 词:地铁  盾构隧道  小间距  监测  反分析  
收稿时间:2013-12-11

Back Analysis on Construction of Parallel Shield Tunnels with Small Spacing
Li Xiaolin,Guo Ting,Hui Liping. Back Analysis on Construction of Parallel Shield Tunnels with Small Spacing[J]. Chinese Journal of Underground Space and Engineering, 2014, 10(3): 641-649
Authors:Li Xiaolin  Guo Ting  Hui Liping
Affiliation:1.Beijing University of Technology, Beijing 100022, China;2.Beijing Urban Engineering Design & Research Institute Co., Ltd, Beijing 100037, China
Abstract:
Based on the project of two shield tunnels between Sanyuanqiao station and Liangmahe station of Beijing subway line 10, the back analysis method according to monitoring data of interaction between two small spacing shield tunnels in long parallel distance is proposed. Based on monitoring data, the crosswise and lengthwise internal forces of shield tunnel were analyzed, which was used to guide the construction of the shield tunnel. Study indicates that latter shield tunnel may press and unload front shield tunnel and causes internal force change of front shield tunnel in construction of two small spacing shield tunnels in long parallel distance, which coincides to monitoring data in construction. The research method and engineering practice rules can be used for reference in design, construction and monitoring of subway and analogous projects.
Keywords:subway  shield tunnel  small spacing  monitoring  back analysis  
点击此处可从《地下空间与工程学报》浏览原始摘要信息
点击此处可从《地下空间与工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号