首页 | 本学科首页   官方微博 | 高级检索  
     

“逆作法”桥梁排桩式桥台合理尺寸计算探讨
引用本文:牛涛.“逆作法”桥梁排桩式桥台合理尺寸计算探讨[J].城市建筑,2014(18):365-366.
作者姓名:牛涛
作者单位:西安市政设计研究院有限公司,西安710068
摘    要:将用作临时支护的排桩与桥梁永久构件的桥台结合起来,不仅能使结构受力合理,也节约了临时设施。本文对排桩基于水平土拱效应的合理间距、逆作法施工过程中排桩作为单支点支护桩的合理入土深度、桩身强度及作为永久桩基的最小桩长做了系统分析。

关 键 词:逆作法  桩间距

Reasonable Size Calculation of Rowed Pile Type Abutment for“Top-Down Method”Bridge
Niu Tao.Reasonable Size Calculation of Rowed Pile Type Abutment for“Top-Down Method”Bridge[J].Urbanism and Architecture,2014(18):365-366.
Authors:Niu Tao
Abstract:Combined a permanent abutment with temporary support pile, the bridge not only can make the structure more reasonable, also can save temporary facilities. The paper takes a system analysis for the reasonable spacing of pile foundation in horizontal soil arching effect, reasonable depth in the earth, pile strength and the minimum pile length of permanent pile foundation of rowed pile which is severed as support pile in top-down method construction.
Keywords:top-down method  pile spacing
本文献已被 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号