乌鲁瓦提面板坝一期面板混凝土浇筑温控与防裂措施 |
| |
引用本文: | 阎立义.乌鲁瓦提面板坝一期面板混凝土浇筑温控与防裂措施[J].电网与水力发电进展,1999(4). |
| |
作者姓名: | 阎立义 |
| |
作者单位: | 陕西省水电工程局第二工程处!陕西西安,710068 |
| |
摘 要: | 从乌鲁瓦提工程主坝一期面板混凝土施工气象要素资料分析出发,对一期面板混凝土入仓温控、洒水保湿、覆盖保温及面板越冬安全等方面进行了分析计算,提出一期面板混凝土浇筑与养护措施。
|
关 键 词: | 乌鲁瓦提 面板坝 混凝土面板 温控 防裂 养护 |
Temperature control and crack prevention in concrete placement for 1st phase face slab of Wuluwati Project |
| |
Authors: | YAN Li-yi |
| |
Abstract: | Based on meteorological data analysis, the temperature control when casting concreteinto silo, humidity keeping by sprinkling water, curing mats for keeping temperature, overwin-ter safety measure and the other factors are analyzed and calculated, on which the measures forconcrete placement and curing are putting foreword. |
| |
Keywords: | Wuluwati face slab dam concrete face slab temperature control rack prevention curing measures |