首页 | 本学科首页   官方微博 | 高级检索  
     

国华惠电二期工程辅助车间控制方案探讨
引用本文:王自主,秦岗.国华惠电二期工程辅助车间控制方案探讨[J].红水河,2012(4):99-101.
作者姓名:王自主  秦岗
作者单位:神华国华惠州热电分公司;广西电力工业勘察设计研究院
摘    要:为实现减员增效、提高自动化水平,国华惠电二期工程新建辅助车间拟实行集中控制。文章结合该电厂的现状,分析了现有辅控网的特点,比较了二期辅助车间的多种控制方案,并给出了推荐性意见。

关 键 词:集中控制  辅助车间  国华惠电二期工程

Discussion on Auxiliary Shop Control Scheme for Guohua Huizhou Power Plant Phase-II Project
WANG Zi-zhu,QIN Gang.Discussion on Auxiliary Shop Control Scheme for Guohua Huizhou Power Plant Phase-II Project[J].Hongshui River,2012(4):99-101.
Authors:WANG Zi-zhu  QIN Gang
Affiliation:1.Shenhua Guohua Huizhou Co-generation Branch,Guangdong,Huizhou,516082;2.Guangxi Electric Power Industry Investigation Design and Research Institute,Guangxi,Nanning,530023)
Abstract:In order to increase economic benefit by reducing employees and improving the automatic level,the newly built auxiliary shop for Guohua Huizhou power plant phase-II project is proposed to be in centralized control.According to the actual state of the power plant,the paper analyzes the characteristics of the existing auxiliary control network,and puts forwards a recommended scheme based on comparisons of several control schemes for the auxiliary shop.
Keywords:centralized control  auxiliary shop  Guohua Huizhou power plant phase-II project
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号