首页 | 本学科首页   官方微博 | 高级检索  
     

水电建筑群的混凝土拆除
引用本文:赵文亭.水电建筑群的混凝土拆除[J].工程爆破,1997,3(2):57-61.
作者姓名:赵文亭
作者单位:水利部海委引滦工程管理局
摘    要:潘家口小水电群在建设中需要在原有建筑物上拆除混凝土,须克服场地窄小,交通不便、设备安全、环保问题等困难。采用了行之有效的静、动态爆破方案,成功地从54个部位拆除钢筋混凝土1200多立方米,从而保证了小水电群建设投产。

关 键 词:爆破拆除  混凝土拆除

DEMOLITION OF CONCRETE CONSTRUCTION IN THE HYDROELECTRIC STATION
Zhao Wenting.DEMOLITION OF CONCRETE CONSTRUCTION IN THE HYDROELECTRIC STATION[J].Engineering Blasting,1997,3(2):57-61.
Authors:Zhao Wenting
Abstract:In construction of the Panjiakou Hydroelectric Station, it needed to demolish concrete from original buildings. Many difficulties had been overcome, including narrow construction place, terrible traffic,equipment safety, environment protection etc., and the efficient blasting project of static and dynamic explosion had been adopted. Reinforced concrete, more 1200m 3 was succeeded in demolishing at 54 regions, so that the small hydroelectric station was safely put into operation.
Keywords:Blasting demolition  Concrete demolition  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号