Two-stage precipitation process of iron and arsenic from acid leaching solutions |
| |
Authors: | N.J.BOLIN J.E.SUNDKVIST Boliden Mineral AB SE- Boliden SWEDEN |
| |
Affiliation: | Boliden Mineral AB, SE-936 81 Boliden, SWEDEN |
| |
Abstract: | ![]() A leaching process for base metals recovery often generates considerable amounts of impurities such as iron and arsenic into the solution.It is a challenge to separate the non-valuable metals into manageable and stable waste products for final disposal,without loosing the valuable constituents.Boliden Mineral AB has patented a two-stage precipitation process that gives a very clean iron-arsenic precipitate by a minimum of coprecipitation of base metals.The obtained product shows to have good sedimentation and filtration properties,which makes it easy to recover the iron-arsenic depleted solution by filtration and washing of the precipitate.Continuos bench scale tests have been done,showing the excellent results achieved by the two-stage precipitation process. |
| |
Keywords: | leaching bioleaching precipitation iron removal |
本文献已被 CNKI 维普 万方数据 ScienceDirect 等数据库收录! |