首页 | 本学科首页   官方微博 | 高级检索  
     


Two-way transmission at 2.488 Gbit/s over a 132 km operational submerged cable using erbium-doped fibre power amplifiers
Authors:Bryant   E.G. Carter   S.F. Lewis   R.B.J. Spirit   D.M. Widdowson   T. Wright   J.V.
Affiliation:British Telecom Res. Lab., Ipswich, UK;
Abstract:
The results of a field trial on the UK-Channel Islands No.7 cable, in which ruggedised, broadband erbium power amplifiers were used to achieve two-way transmission at 2.488 Gbit/s over a 132 km submerged cable is reported.<>
Keywords:
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号