首页 | 本学科首页   官方微博 | 高级检索  
     

null
作者姓名:徐平  陈代华
作者单位:1. 长江科学院岩基研究所
2. 长江水利委员会枢纽处,武汉,430010
摘    要: 选取水布垭枢纽中部厂房设计方案的地下厂房区域,采用三维弹塑性有限元法,模拟施工开挖过程,研究了复杂地质条件下洞室群围岩的开挖变形形态与应力状态,分析了围岩塑性区分布及地下厂房洞室群围岩的稳定性,最后提出了设计与施工建议。

关 键 词:水布垭枢纽    地下厂房    三维弹塑性    有限元分析    围岩稳定
修稿时间:: 1998-06-15

Three Dimensional Elasto-Plastic Analysis on Stability of Surroun ding Rock of Shuibuya Project's Underground Plant
Xu Ping,Chen Daihua.null[J].Journal of Yangtze River Scientific Research Institute,1999,16(1):48-51.
Authors:Xu Ping  Chen Daihua
Abstract:In this paper,the construction and excavation process of underground plant of the Shuibuya Project are simulated by 3D elasto plastic FEM.The excavating deformation pattern and stress state of the chamber group surrounding rock under complex geological conditions are researched .The distribution of plastic areas and stability of surrounding rock is analysed.Finally some suggestions for design and construction are given.
Keywords:Shuibuya Project  underground powerplant  3D elasto  plastic FEM analysis  surrounding rock stability
本文献已被 CNKI 维普 万方数据 等数据库收录!
点击此处可从《长江科学院院报》浏览原始摘要信息
点击此处可从《长江科学院院报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号