首页 | 本学科首页   官方微博 | 高级检索  
     

双反馈减压阀在龙滩水电站的应用
引用本文:吴祖平.双反馈减压阀在龙滩水电站的应用[J].水力发电,2009,35(6).
作者姓名:吴祖平
作者单位:龙滩水力发电厂,广西,天峨,547300
摘    要:龙滩水电站位于广西天峨县境内,距天峨县城15 km.工程按正常蓄水位400 m设计,按初期蓄水位375 m建设.电站初期安装7台单机容量700 MW混流式水轮发电机组;后期再安装2台单机容量700 MW混流式水轮发电机组.龙滩水电站技术供水、消防供水以及空调供水系统采用双反馈减压阀,该阀门在3个供水系统中都得到了成功的应用,效果明显.为此,对双反馈减压阀的结构特点、工作原理以及调节方法进行介绍.

关 键 词:双反馈  减压阀  龙滩水电站

Application of Double Feedback Pressure Reducing Valve to the Longtan Hydropower Station
Wu Zuping.Application of Double Feedback Pressure Reducing Valve to the Longtan Hydropower Station[J].Water Power,2009,35(6).
Authors:Wu Zuping
Abstract:Longtan Hydropower Station is located in the Tian'e County of Guangxi, 15 km far from Tian'e County. It is designed that the normal water level is 400 m but constructed according to the initial water level of 375 m. It is equipped with Francis hydro-generating unit with initial installed capacity of 700MW each and 7 units. Then two single capacity of 700 MW Francis hydro-generating unit will be installed late. The technical water supply, fire water supply and air conditioning water supply system of Longtan Hydropower Station adopts double feedback pressure reducing valve, and all the valves in the three water supply systems were successful and gained good effectiveness, For this reason, this paper introduces the structure characteristics, working principle and the method of adjustment of double feedback pressure reducing valve.
Keywords:double feedback  pressure reducing valve  Longtan Hydropower Station
本文献已被 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号