首页 | 本学科首页   官方微博 | 高级检索  
     

1025t/h锅炉结焦的原因分析及对策
引用本文:王文国,姬学海.1025t/h锅炉结焦的原因分析及对策[J].宁夏电力,2005(Z1):177-178.
作者姓名:王文国  姬学海
作者单位:宁夏大坝发电有限责任公司,青铜峡市,751607
摘    要:从锅炉炉膛结构设计、燃煤煤质、运行工况等方面来分析大坝发电公司#3锅炉结焦问题,认为锅炉结焦主要是由于炉膛横断面尺寸设计值偏小、燃用煤易结焦、局部运行氧量偏低、炉膛出口烟温偏高等原因造成的,为此提出一些综合治理的对策.

关 键 词:锅炉    燃烧  结焦  优化调整
文章编号:1672-3643(2005)ZK-0177-02
修稿时间:2005年6月9日

Cause analysis and countermeasures for 1025t/h boiler agglutinating matter
WANG Wen-guo,JI Xue-hai.Cause analysis and countermeasures for 1025t/h boiler agglutinating matter[J].Ningxia Electric Power,2005(Z1):177-178.
Authors:WANG Wen-guo  JI Xue-hai
Affiliation:Qingtongxia 751607
Abstract:Analyzes baking problems of No.3 boiler from the sides of boiler furnace structure design, coal quality and operation. Thinks boiler baking is mainly caused by furnace cross dimension designed small, coal baking easily, operating oxygen lower but furnace outlet smoke temperature higher, so put forward some countermeasures.
Keywords:boiler  coal  burning  baking  optimize and adjust
本文献已被 CNKI 万方数据 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号