大朝山水电站上,下游土石围堰和高压喷射灌浆防渗墙设计
引用本文:薛宝臣.大朝山水电站上,下游土石围堰和高压喷射灌浆防渗墙设计[J].云南水力发电,1998,14(1):42-46.
作者姓名:薛宝臣
作者单位:电力部水利部北京勘测设计研究院
摘    要:大朝山水电站上游临时土石围堰和下游土石过水围堰基础覆盖层厚、透水性强,具有深水填筑,要求闭气时间短等特点。在设计中,通过堰型选择,采用堰体粘土心墙、覆盖层高压喷射灌浆板墙防渗型式。下游土石过水围堰采用混凝土楔型体结合钢筋笼块石护面等新技术,解决了土石围堰防渗和渡汛保护问题。

关 键 词:大朝山水电站  土石围堰  过水围堰  高压喷射灌浆  旋喷

Design of Upstream/Downstream Earth Rockfill Cofferdams and Highpressure Gunite Impervious Wall for The Dachaoshan Hydropower Project
Xue,Baochen.Design of Upstream/Downstream Earth Rockfill Cofferdams and Highpressure Gunite Impervious Wall for The Dachaoshan Hydropower Project[J].Yunnan Water Power,1998,14(1):42-46.
Authors:Xue  Baochen
Abstract:The upstream temporary earth and rockfill cofferdam and the downstream earth and rockfill over-topping cofferdam are characterized by their foundations having thick overburden and high permeability as well as under _ water placement and short closing time for the construction of the Dachaoshan Hydropower Project. A clay core earth and rockfill cofferdam with a high pressure gunite impervious wall in the overburden has been built through comparison between different types of cofferdams in the desigm , and the new technique has been employed for the downstream earth and roxkfill overtopping cofferdam, which is composed of a concrete wedge _ shaped body in combination with reinforcing _caged block stones to solve impermeability and protection problem during flood seasons.
Keywords:Dachaoshan Hydropower Project    Overtoppin cofferdam    High pressure gunite