首页 | 本学科首页   官方微博 | 高级检索  
     

户宋河电站主坝设计与施工
引用本文:窦志明. 户宋河电站主坝设计与施工[J]. 云南水力发电, 1998, 14(2): 33-37
作者姓名:窦志明
作者单位:电力部昆明勘测设计研究院
摘    要:户宋河电站主坝为混合花岗岩风化料均质土坝,坝高45m,坝顶长249.08m。本文结合坝址处的工程自然条件,介绍户宋河主坝的坝型选择、主坝设计及修改完善过程、坝料碾压试验及施工和施工质量控制。

关 键 词:户宋河电站  主坝设计  主坝施工

Design and Construction of Main Dam of Husonghe Hydropower Station
Dou Zhiming. Design and Construction of Main Dam of Husonghe Hydropower Station[J]. Yunnan Water Power, 1998, 14(2): 33-37
Authors:Dou Zhiming
Abstract:The main dam of the Husonghe Hydropower Station is a homogeneous earth structure composed of weathered granite material, 45m high and 249.08m long. This paper gives a presentation of type selection, design and its optimization of the main dam, as well as its roller compaction test,construction and quality control on the basis of the natural and topographical conditions at the dam site.
Keywords:Husonghe Hydropower Station Design of main dam Construction of main dam
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号