泰钢1^#高炉长期封炉及扒炉实践
引用本文:孙守建.泰钢1^#高炉长期封炉及扒炉实践[J].山东冶金,2009,31(4):26-28.
作者姓名:孙守建
作者单位:山东泰山钢铁集团有限公司,山东莱芜,271100
摘    要:泰钢1^#高炉通过焊补炉壳、堵严风口、装入水渣、降低冷却强度、关闭炉顶大放散等措施实施了封炉操作。因不具备开炉条件,且料线下降了约7m,因此,通过氮气灭炉,炉顶打水凉炉,进行了清理炉料、炉缸的扒炉操作。高炉炉身4层钩头冷却壁以上的砖衬比较完整,炉身下部、炉腰、炉腹部位完全没有砖衬,说明必须根据炉衬的实际工作状况,制定有效的抑制边缘气流的措施并且加强高炉炉身中下部、炉腰、炉腹的冷却制度管理,才能延长一代炉龄。

关 键 词:高炉  封炉  扒炉  炉衬侵蚀

Long-team Banking and Raking out Practice of Taisan Steel's No.1 BF
SUN Shou-jian.Long-team Banking and Raking out Practice of Taisan Steel's No.1 BF[J].Shandong Metallurgy,2009,31(4):26-28.
Authors:SUN Shou-jian
Affiliation:Shandong Taisan Iron and Steel Group Corporation;Laiwu 271100;China
Abstract:By repair welding furnace shell,plugging tuyere,input of granulated slag,decreasing cooling intensity and closing the valve of top etc,Taisan Steel's No.1 BF was banked.Because the blast furnace didn't have the condition of on-stream and the stock level decreased seven meters about,raking out operation was made by quenching the gas fire and coke in the furnace with nitrogen and decreasing the furnace temperature through top watering.The brick lining on the forth cooling stave was full and there were no the ...
Keywords:blast furnace  banking  raking out  lining attack  