首页 | 本学科首页   官方微博 | 高级检索  
     

瀑布沟工程的水文分析计算
引用本文:晏云鹏.瀑布沟工程的水文分析计算[J].四川水力发电,1992(Z1).
作者姓名:晏云鹏
作者单位:成都勘测设计研究院
摘    要:本文简要的介绍了瀑布沟工程水文分析计算主要依据站的选定和基本资料的插补延长,以及径流、洪水的分析计算方法.在可行性研究阶段水文成果(通过审查)和新设立的毛头码水文站所取得的数年水文资料的基础上,将初设阶段对可行性研究阶段的水文分析计算方法和成果进行验证和补充的情况重点予以介绍.

关 键 词:瀑布沟电站  水文分析计算  资料的插补延长  径流洪水分析计算

Hydrologic Analysis for Pubugou Hydropower Project
Yan YunPeng.Hydrologic Analysis for Pubugou Hydropower Project[J].Sichuan Water Power,1992(Z1).
Authors:Yan YunPeng
Affiliation:Chengdu Hydroelectric Investigation and Design Reserch Institute
Abstract:Selection of gauging stations where main hydrologic analysis considerations for Pubugou Project were obtained.the extrapolation of interpolation of the basic data,analysis method for runoff and flood are briefly introduced. Based on hydrologic data results obtained at feasibility study stage (passed examination) and long-term hydrologic data obtained in newly-established Maotouma Gauging Station,the fact is described in detail that the hydrologic analysis methods and results in feasibility study stage were checked and compl-mented in Preliminary Design Stage.
Keywords:Pubugou Hydropower Station  hydrologic analysis  extrapolation of data interpolation  analysis for runoff and flood  
本文献已被 CNKI 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号