首页 | 本学科首页   官方微博 | 高级检索  
     

巷道与上部煤柱边缘间水平距离X的选择
引用本文:陆士良 孙永联. 巷道与上部煤柱边缘间水平距离X的选择[J]. 中国矿业大学学报, 1993, 22(2): 1-7
作者姓名:陆士良 孙永联
作者单位:中国矿业大学采矿系(陆士良,孙永联),中国矿业大学采矿系(姜耀东)
摘    要:
巷道与上部煤柱边缘之间的水平距离X,是底板岩巷和邻近煤层巷道布置的重要参数。本文根据矿山压力的研究成果,阐述了上部煤层采动状况,巷道围岩性质,巷道与上部煤层之间的垂距Z、以及巷道与上部煤柱边缘间水平距离X间的定量关系,为正确选择X值及巷道与上部煤层回采空间的相对位置关系提供了主要依据。

关 键 词:巷道布置  围岩变形  上部煤柱  水平距离

Selection of Horizontal Distance X Between Roadway and the Edge of its Upper Pillar
Lu Shiliang Sun Yonglia Jiang Yaodong. Selection of Horizontal Distance X Between Roadway and the Edge of its Upper Pillar[J]. Journal of China University of Mining & Technology, 1993, 22(2): 1-7
Authors:Lu Shiliang Sun Yonglia Jiang Yaodong
Affiliation:Department of Mining Engineering
Abstract:
The horizontal distance X between roadway and the edge of its upper pillar is an important parameter for roadway layout in floor strata and adjacent coal seams. Based on the research achievements of strata pressure, this paper illustrates the quantitative relation among the mining situation of upper coal seam, surrounding rock properties of roadway, the vertical distance Z (between roadway and its upper coal seam), and the horizontal distance X (between roadway and the edge of its upper pillar), which provides a main basis for the selection of X value and the relative location between roadway and its upper coal seams.
Keywords:roadway layout   deformation of surrounding rock   upper pillar   horizontal distance  
本文献已被 CNKI 维普 等数据库收录!
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号