首页 | 本学科首页   官方微博 | 高级检索  
     

大规模分散式充电桩参与电网负荷优化技术研究
引用本文:杨斌,陈振宇,阮文骏,孙宇,陈嘉栋,宋杰.大规模分散式充电桩参与电网负荷优化技术研究[J].电力需求侧管理,2018,20(6):26-30.
作者姓名:杨斌  陈振宇  阮文骏  孙宇  陈嘉栋  宋杰
作者单位:国网江苏省电力有限公司,南京210024,国网江苏省电力有限公司,南京210024,国网江苏省电力有限公司,南京210024,国网江苏常州供电公司,江苏常州213003,国电南瑞科技股份有限公司,南京211106,国电南瑞科技股份有限公司,南京211106
基金项目:国家重点研发计划资助“城区用户与电网供需友好互动系统”(2016YFB0901100)
摘    要:电动汽车(electric vehicles, EV)发展迅速,分散式充电桩参与电网调控蕴含巨大潜力。对比负荷运行典型评估指标,将负荷波动率作为优化目标,重点构建了分散式充电桩参与电网负荷优化的多目标优化模型,提取负荷波动率的关键特征,建立表征负荷波动率的优化目标函数;引入电力奖励积分解决电价不灵活的问题,构建用户成本优化目标函数;以南京市区某配网馈线的典型夏季负荷为例,利用MATLAB工具对2 000辆可参与日调峰汽车、500辆可参与夜填谷汽车的负荷优化进行仿真分析,结果显示电网负荷波动率明显下降,用户成本大大降低。

关 键 词:分散式充电桩  负荷优化  负荷波动率  成本优化  行为约束  MATLAB仿真
收稿时间:2018/5/22 0:00:00
修稿时间:2018/8/23 0:00:00

Research on grid load optimization technology participated by large scale distributed charging piles
YANG Bin,CHEN Zhen yu,RUAN Wen jun,SUN Yu,CHEN Jia dong and SONG Jie.Research on grid load optimization technology participated by large scale distributed charging piles[J].Power Demand Side Management,2018,20(6):26-30.
Authors:YANG Bin  CHEN Zhen yu  RUAN Wen jun  SUN Yu  CHEN Jia dong and SONG Jie
Affiliation:State Grid Jiangsu Electric Power Co.,Ltd.,Nanjing 210024,China,State Grid Jiangsu Electric Power Co.,Ltd.,Nanjing 210024,China,State Grid Jiangsu Electric Power Co.,Ltd.,Nanjing 210024,China,State Grid Changzhou Power Supply Company,Changzhou 213003,China,Nari Technology Development Limited Company,Nanjing 211106,China and Nari Technology Development Limited Company,Nanjing 211106,China
Abstract:Due to the rapid development of electric vehicles,there is much potential for distributed charging piles to participate in power grid management. Typical evaluation indicators of load operation are compared, load fluctuation rate is selected as the objective of optimization, multiple target optimization model for load optimization with distributed charging piles is established, and the key characteristics of load fluctuation rate are extracted to establish the simple target function describing load fluctuation rate. The inflexibility of electricity pricing is solved by introduction of incentive points, and optimization target function of end user cost is built. Typical summer load conditions of certain distribution system feeder line located in Nanjing is taken for instance. MATLAB is used to simulate the load optimization featuring peak shifting and valley filling participated by 2 000 EVs and 500 EVs. It turns out that the fluctuation rate of grid load reduces obviously and the end users save cost greatly.
Keywords:distributed charging pile  load optimization  load fluctuation rate  cost optimization  behavior constraints  MATLAB simulation
点击此处可从《电力需求侧管理》浏览原始摘要信息
点击此处可从《电力需求侧管理》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号