Abstract: | Subject SZK oil field located at the basin of the Precaspian, the main risk of drilling operation in this oil field is drill string easy get stuck during drilling the claystone, wash--out the hole diameter, leakage and contamined in pay zone, etc. Made a suitable measurement in drill fluid system and treatment while drilling in this block, to prevent and reduce the risk of loss circulation and so on, it acctually shorten cycle and lowen the operation cost, and make the hole condition more better. |