首页 | 本学科首页   官方微博 | 高级检索  
     

大尺度土坝漫顶溃决试验工程性态测试与分析
引用本文:王士军,谷艳昌,王宏,黄海兵,严吉皞,庞琼.大尺度土坝漫顶溃决试验工程性态测试与分析[J].岩土工程学报,2016,38(10):1881-1888.
作者姓名:王士军  谷艳昌  王宏  黄海兵  严吉皞  庞琼
作者单位:1. 南京水利科学研究院,江苏 南京 210029; 2.水利部大坝安全管理中心,江苏 南京 210029
基金项目:国家重点研发计划项目(2016YFC0401600); 国家国际科技合作专项项目(2011DFA72810); 水利部公益性行业科研专项(201501033); 南京水利科学研究院重点基金项目(Y713007); 江苏
摘    要:漫顶是土坝溃决的主要原因。利用原体试验土坝(坝高9.7 m),应用渗流压力、水分、测斜、分布式光缆等传感器及数据采集系统,开展了漫顶溃决试验工程性态测试研究,获取了试验坝填筑、分阶段蓄水和溃决过程的渗流、温度和变形的测试数据及变化特征。测试结果分析表明:坝体渗流压力与库水位明显相关,坝体含水率灵敏性比渗流压力灵敏性快;坝体水平位移由向上游逐渐向下游发展,坝体最大倾度2.242°,坝顶表面最大沉降率为5.21%。测试结果为土坝灾变机理研究及溃坝早期预警提供基础数据。

关 键 词:土坝  大尺度  漫顶溃决试验  测试技术  
收稿时间:2015-08-24

Monitoring and analysis of full-scale embankment overtopping failure tests
WANG Shi-jun,GU Yan-chang,WANG Hong,HUANG Hai-bing,YAN Ji-hao,PANG Qiong.Monitoring and analysis of full-scale embankment overtopping failure tests[J].Chinese Journal of Geotechnical Engineering,2016,38(10):1881-1888.
Authors:WANG Shi-jun  GU Yan-chang  WANG Hong  HUANG Hai-bing  YAN Ji-hao  PANG Qiong
Affiliation:1. Nanjing Hydraulic Research Institute, Nanjing 210029, China;2. Dam Safety Management Center of the Ministry of Water Resources, Nanjing 210029, China
Abstract:Overtopping is one of the major factors leading to embankment dam failure. In order to study dam performance and evolution before dam failure, a full-scale overtopping failure test on embankment dam with the maximum height of 9.7 m is carried out. The monitoring techniques for the test with various instruments are introduced, including water level gauges, thermometers, osmometers, piezometer tubes, distributed optical cables, moisture transducers, inclinometers, multi-parameter transducers, total station, level gauges, etc. The seepage, deformation, temperature data and variation characteristics of the dam are monitored from dam filling, initial impounding to dam failure. The monitoring data are analyzed, showing the reliability and validity of the osmometers, moisture transducers, inclinometers and multi-parameter transducers, and their monitoring techniques are verified. The moisture transducers are more sensitive than the osmometers during reservoir impounding. The dam body deflects from upstream to downstream with the increase of reservoir water. The observed maximum dam settlement is 5.21%, and the observed maximum dam inclination is 2.242°. The research results are valuable to the study on the evolution mechanism of dams and the early-warning indices of unexpected accidents.
Keywords:embankment dam  full scale  overtopping failure test  monitoring technique  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文