首页 | 本学科首页   官方微博 | 高级检索  
     


Model to determine the capacity of wafer fabrications for batch-serial processes with time constraints
Authors:Ying-Mei Tu  Chiu-Ling Chen
Affiliation:1. Department of Industrial Management , Chung Hua University , Taiwan No. 707, Sec. 2, WuFu Road, HsinChu, Taiwan 300, ROC amytu@chu.edu.tw;3. Graduate Institute of Management of Technology, Chung Hua University , Taiwan No.707, Sec.2, WuFu Road, HsinChu, Taiwan 300, ROC
Abstract:Time constraints related issues are unavoidable in wafer fabrications. However, when the lots released from a batch workstation overload the downstream serial workstation the consequences are more serious. Under a time constraints environment, peak workload is a critical problem that seriously hurts the overall performance of the downstream workstation. This work applies a GI/G/m queuing network to develop a capacity planning model for batch-serial processes. By applying this queuing network model, the expected waiting time between batch-serial processes can be estimated. Managers can also determine the capacity through the setting of expected rate of exceeding time constraints. The arrival smoothing of the upstream batch workstation and its effect on the downstream workstation is also analysed. The results show that arrival smoothing can effectively decrease the waiting time on the downstream serial workstation through increasing the upstream number of batch machines and decreasing the batch size. The results also conclude that increasing the number of downstream serial machines is not the only option under the batch-serial process in a time constraint environment. Therefore, an investment function of batch-serial process equipment with time constraints is established in this work that can support managers when making investment decisions.
Keywords:capacity planning  time constraints  batch-serial processes  queuing theory  arrival smoothing
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号