首页 | 本学科首页   官方微博 | 高级检索  
     

非饱和土地区高速铁路路基沉降预测模型
引用本文:冯怀平,耿会岭,韩博文,商卫东,常建梅.非饱和土地区高速铁路路基沉降预测模型[J].岩土工程学报,2017,39(6):1089-1095.
作者姓名:冯怀平  耿会岭  韩博文  商卫东  常建梅
作者单位:1. 石家庄铁道大学土木工程学院,河北 石家庄 050043;2. 河北建设勘察研究院有限公司,河北 石家庄 050031
基金项目:国家自然科学基金项目(51478279); 河北省教育厅2015年度科学技术研究项目(QN2015117)
摘    要:准确、合理地预测线路工后沉降是高速铁路建设的关键,现场沉降观测数据表明不同饱和度地区路基沉降曲线线型变化较大,基于饱和理论的沉降预测方法在工后沉降预测中存在不能准确描述沉降规律,且存在预测值偏小的风险。基于实测沉降规律,提出了一个适用于非饱和土地区路基的沉降预测曲线模型。分析了预测曲线模型的特点,并基于最小二乘法给出模型参数的求解方法。结合兰新铁路第二双线LXS-15标段沉降数据,提出相关系数、偏差度、稳定度为模型有效性检验指标,结合施工完成2 a的实测资料,进行了在施工完成3个月及6个月所提模型与规范要求3种预测模型的对比研究;对3条不同饱和程度高铁路基沉降预测结果表明所提出的非饱和土预测模型具有较好的精度和广泛的适用性,为非饱和土地区高速铁路建设合理判断工后沉降提供参考。

关 键 词:非饱和土    高速铁路    工后沉降    预测模型  
收稿时间:2016-08-16

Prediction model for settlement of high-speed railway embankment in unsaturated areas
FENG Huai-ping,GENG Hui-ling,HAN Bo-wen,SHANG Wei-dong,CHANG Jian-mei.Prediction model for settlement of high-speed railway embankment in unsaturated areas[J].Chinese Journal of Geotechnical Engineering,2017,39(6):1089-1095.
Authors:FENG Huai-ping  GENG Hui-ling  HAN Bo-wen  SHANG Wei-dong  CHANG Jian-mei
Affiliation:1. School of Civil Engineering, Shijiazhuang Tie Dao University, Shijiazhuang 050043, China;2. Hebei Research Institute of Construction & Geotechnical Investigation Co., Ltd., Shijiazhuang 050031, China
Abstract:The precise prediction of post-construction settlement for high-speed railways is one of the key techniques in successful construction of high-speed railways. The in-situ observation data show that the shapes of settlement vary greatly under different unsaturated conditions. Limitations and risks are observed to predict unsaturated settlement using the traditional predication methods based on the saturated theory. A new prediction method for post-construction settlement of unsaturated high-speed railway embankment is proposed. The characteristics of the proposed model are analyzed, and the solving algorithm for the model is developed. Based on the observed settlement data in LXS-15 of Lanzhou-Xinjiang Double-Line Railway, predictions are carried out respectively using the proposed model and other three methods. By defining the correlation coefficient, deviation degree and stability property as the evaluation indices and using 2 years' continuous in-situ observation data, the prediction precision is investigated and compared. The applications in three sections with different saturations show that the proposed settlement prediction model is feasible and scientific for unsaturated embankment of high-speed railways, and it may provide a method for prediction of post-construction settlement of high-speed railways in unsaturated areas.
Keywords:unsaturated soil  high-speed railway  post-construction settlement  prediction model  
本文献已被 CNKI 等数据库收录!
点击此处可从《岩土工程学报》浏览原始摘要信息
点击此处可从《岩土工程学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号