摘    要:把冰、水、热动力学理论与爆破效果相结合,提出了在冰坝易发点沿深泓线实施冰下爆破形成温度场预防冰坝灾害的理论,包括:爆破时间的选择,爆破孔的布置,爆破效果的估计,温度场水温及下游冰盖下水温的影响长度和冰盖融化速率的计算。黑龙江开江期冰下爆破的实践表明,爆破坑平均直径随炸药量的增加而增加,但在炸药量超过18 kg时,爆破坑平均直径随炸药量的增加变化不大;根据实测单位炸药量破碎的冰盖体积的效果,建议冰下爆破预防冰坝的单孔炸药量应不超过9 kg,包括冰盖厚度超过1 m的情况。

关 键 词:冰下爆破  冰坝  爆破孔布置  温度场  影响长度
收稿时间:2019/8/5 0:00:00

Theory exploration and practice of preventing ice dam by blasting under ice
YANG Kailin,GUO Xinlei,WANG Tao,GUO Yongxin,PENG Xuming and WU Yunan.Theory exploration and practice of preventing ice dam by blasting under ice[J].Journal of Hydraulic Engineering,2020,51(2):127-139.
Authors:YANG Kailin  GUO Xinlei  WANG Tao  GUO Yongxin  PENG Xuming and WU Yunan
Affiliation:State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100038, China,State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100038, China,State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100038, China,State Key Laboratory of Simulation and Regulation of Water Cycle in River Basin, China Institute of Water Resources and Hydropower Research, Beijing 100038, China,Support Center Flood Control and Drought Relief of Heilongjiang Province, Harbin 150001, China and Support Center Flood Control and Drought Relief of Heilongjiang Province, Harbin 150001, China
Abstract:Combining ice, water and thermal dynamics theory with blasting effect, the theory of forming temperature field to prevent ice dam disaster is put forward by blasting under ice along thalweg line at the prone point of ice dam,including the selection of blasting time,the arrangement of blasting holes,the estimation of blasting effect, the calculation of the influence length of the temperature field water temperature and the downstream ice cover water temperature and the ice cover melting rate. The practice of ice blasting before ice cover breakup of Heilongjiang River shows that the diameter of the blasting pit increases with the increase of explosive quantity,but when the explosive quantity exceeds 18kg,the diameter of the blasting pit does not change much with the increase of explosive quantity. According to the measured volume of ice cover broken per unit explosive amount,it is suggested that the explosive amount per hole should not exceed 9kg for blasting under ice,including the case where the thickness of ice cover exceeds 1 m.
Keywords:blasting under ice  ice dam  blasting hole arrangement  temperature field  influence length
本文献已被 CNKI 万方数据 等数据库收录!
点击此处可从《水利学报》浏览原始摘要信息
点击此处可从《水利学报》下载全文
设为首页 | 免责声明 | 关于勤云 | 加入收藏

Copyright©北京勤云科技发展有限公司  京ICP备09084417号